January 2026 Building Progress
28-01-2026
If you've been down to the the site recently (70-74 Hilling St, Titirangi), you will have noticed a lot of building activity. The framing of our main building is going up. The staff carpark has been completed, and our staff room and student common room at the rear of the site are undergoing finishing touches.
The labelled rendered image below should gives a perspective of the photos. In the wooden framing (currently only the ground floor), you will notice some other features such as the toilet block and sick bay behind the technology space, the physics project room/dark room behind the physics lab and the main reception area, including the elevator shaft.